|
|
turbine
BLADES - buckets |
ETS produces OEM equivalent turbine blades and buckets for a range of industrial turbines:
- W251 B9–12
- W501 D4, W501 D5, W501 D5A
- GE™ Frame 5
- GE™ Frame 6
- GE™ Frame 7
- GE™ Frame 9
Our turbine blade and bucket durability and upgrades result in lower operating costs and life cycle costs. Our performance upgrades result in lower fuel consumption. |
|
|
| W251 B11/12 equivalent 1st Stage BladeETS W251 1st Stage Turbine Blades feature upgraded coating system for improved thermal durability and repair ability, which results in lower operating costs. When paired with ETS W251 1st stage Ring Segments, better engine performance is achievable. |
 |
|
|
| W251 B11/12 equivalent 2nd Stage BladeETS W251 2nd Stage Turbine Blades feature upgraded coating system for improved thermal durability and repair ability, which results in lower operating costs. |
 |
|
|
| W251 B11/12 equivalent 3rd Stage BladeETS W251 3rd Stage Turbine Blades feature an upgraded material alloy and available upgraded coatings for enhanced life. Service lives are further extendable through ETS’ material rejuvenation program. |
 |
|
|
| GE™ Frame 6B equivalent 1st Stage BucketETS Frame 6B 1st Stage Turbine Buckets feature upgraded coating system for improved thermal durability and repair ability which results in lower operating costs. |
 |
|
|
| GE™ Frame 6B equivalent 2nd Stage BucketETS Frame 6B 2nd Stage Turbine Buckets feature upgraded coating system for improved thermal durability and repair ability which result in lower operating costs. |
 |
|
|
GE™ Frame 6B equivalent 3rd Stage BucketETS Frame 6B 3rd Stage Turbine Buckets feature optional upgraded coating system for improved thermal durability and repair ability, which results in lower operating costs.
|
 |
|
|
GE™ Frame 6FA equivalent 3rd Stage BucketETS Frame 6FA 3rd Stage Turbine Buckets has a design focus on operating reliability and maintainability.
|
 |
|
|
GE™ Frame 7 equivalent 1st Stage BucketETS Frame 7 1st Stage Turbine Buckets has a design focus on operating reliability and maintainability.
|
 |
|
|
GE™ Frame 7 equivalent 2nd Stage BucketETS Frame 7 2nd Stage Turbine Buckets has a design focus on operating reliability and maintainability.
|
 |
|
|
GE™ Frame 7 equivalent 3rd Stage BucketETS Frame 7 3rd Stage Turbine Buckets has a design focus on operating reliability and maintainability.
|
 |
|
|
|
|
|
|